Answer 2 main question of the assignment. Detailed explain needed. Problem Solving Assignment: Answer the following questions. To get

Answer 2 main question of the assignment. Detailed explain needed.

Problem Solving Assignment: Answer the following questions. To get full credit for your work, your responses to each section must be clearly marked and explained. Where needed, show your work with a brief explanation for each part of the question
 

Q1-      In 2017, the Restaurant Hospitality website reported that only 11% of surplus food is being recovered in the food service and restaurant sector, leaving approximately 1.5 billion meals per year uneaten. Assume that this is the true population proportion and that you plan to take a sample survey of 525 companies in the food service and restaurant sector to further investigate their behavior. You suspect that restaurants are doing a far better job in recovering surplus food than what has been reported by the website.
Suppose that based on the sample you collected restaurants report an average of 59 surplus meals per day of which an equivalent of 51 meals is thrown away. Respond to the following questions:  

a.      Set up the research question and hypotheses. –
Let’s set up Accounting related question.

b.      Calculate the p-value using the “Norm.dist” Excel command.

c.      What is your conclusion?   

Q2-      A computer manufacturer needs 7,500 units of a component to complete an order for a distributor. If done in-house, the fixed cost would be$325,000 with variable cost at $25 per unit. Alternative two is to outsource for a total cost of $75 per unit with a set-up/tooling cost of $50,000 (fixed cost). The selling price for the item is $110. Answer the following questions:

a.      Determine the breakeven quantity for each alternative.

b.      Determine the breakeven quantity between the two alternatives. In other words, at what level of production the company would be indifferent between outsourcing the order and in-house production.

c.      For the current order, should they make the item in-house or outsource it?

d.      At what order quantity would it become optimal to make the item in-house rather than outsourcing it?

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

please understand the concept before accepting my bid I’m looking for someone with a background in supply chain management, business analytics, or

please understand the concept before accepting my bid I’m looking for someone with a background in supply chain management, business analytics, or operations management who is proficient in using Excel for forecasting analysis. I need help completing an assignment that involves calculating forecast accuracy metrics — including Forecast Error, Forecast

Assistance with power point  BUSI 601 Learning Project: Plan for Implementation Presentation Assignment Instructions

Assistance with power point  BUSI 601 Learning Project: Plan for Implementation Presentation Assignment Instructions Using the organization selected in the Learning Project: Contemporary Management Techniques Research Paper Assignment, prepare a PowerPoint presentation and Kaltura video outlining the plan for implementation. The PowerPoint slides should include a detailed plan of how

  The construction industry in Bangladesh is on a boom and it needs construction chemicals manufacturer for reliable and good quality construction

  The construction industry in Bangladesh is on a boom and it needs construction chemicals manufacturer for reliable and good quality construction chemicals. Ducon Construction Chemicals Industries Ltd is paving the way for the ultimate value in stronger foundations, leak-proof rooftops and glossy, long-lasting flooring. People involved in construction often