Description

Description

  • The Assignment must be submitted on Blackboard (WORD format only) via allocated folder.
  • Assignments submitted through email will not be accepted.
  • Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the cover page.
  • Students must mention question number clearly in their answer.
  • Late submission will NOT be accepted.
  • Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions.
  • All answered must be typed using Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted and will be considered plagiarism).
  • Submissions without this cover page will NOT be accepted.

Learning Outcomes:

  • To designing profitable services that provide high level of quality to satisfy business needs.
  • To ensure that the services delivered are reasonable and relevant to the customers.
  • To gain an understanding of the business rules and ensure if the results are in alignment with the organizational goals.

Go through the given case scenario

‘There must be a better way of running this place!’ said Dean Hammond, recently recruited General Manager of Boys and Boden, as he finished a somewhat stressful conversation with a complaining customer, a large and loyal local building contractor.

‘We had six weeks to make their special staircase, and we are still late! I’ll have to persuade one of the joiners to work overtime this weekend to get everything ready for Monday. We never seem to get complaints about quality, as our men always do an excellent job … but there is usually a big backlog of work, and something always gets finished late, so how should we set priorities? We could do the most profitable work first, or the work for our biggest customers, or the jobs which are most behind on. In practice, we try to satisfy everyone as best we can, but inevitably someone’s order will be late. In theory, each job should be quite profitable, since we build into the price a big allowance for waste, and for timber defects. And we know the work content of almost any task we would have to do; this is the basis of our estimating system. But, overall, the department is disappointingly unprofitable, and most problems seem to end up with a higher-than-anticipated cost, and with late deliveries!’

Boys and Boden was a small, successful, privately-owned timber and building materials merchant based in a small town. Over the years it had established a large Joinery Department, which made doors, windows, staircases and other timber products, all to the exact special requirements of the customers, mostly comprising numerous local and regional builders. In addition, the joiners would cut and prepare special orders of timber, such as non-standard sections and special profiles, including old designs of skirting board, sometimes at very short notice, and often even while the customers waited. Typically, for larger joinery items, the customer provided simple dimensioned sketches of the required products. These were then passed to the central Estimating and Quotations Department which, in conjunction with the Joinery Manager, calculated costs and prepared a written quotation, which was faxed or posted to the customer. This first stage was normally completed within two or three days, but on occasions could take a week or more. On receipt of an order, the original sketches and estimating details were passed back to the Joinery Manager, who roughly scheduled them into his manufacturing plan, allocating them to individual craftsmen as each became available. Most of the joiners were capable of making any product, and enjoyed the wide variety of challenging work.

The Joinery Department appeared congested and somewhat untidy, but everyone believed that this was acceptable and normal for job shops, since there was no single flow route for materials. Whatever the design of the item being made, it was normal for the joiner to select the required bulk timber from the storage building across the yard. This roughly-sawn timber was then prepared using a planer-thicknesser machine which gave it smooth, parallel surfaces. After that, the joiners would use a variety of processes, depending on product. The timber could be machined into different cross-sectional shapes, cut into component lengths using a radial arm saw, joints were formed by hand tools, or using a morticing machine, and so on. Finally, the products would be glued and assembled with screws and nails, sanded smooth by hand or by machine, and treated with preservatives, stains or varnishes if required. All the large and more expensive floor-standing machines were grouped together by type (for example, saws) or were single pieces of equipment shared by all 10 joiners. Every joiner also owned a complete set of hand tools which they guarded and cared for with pride. Dean described what one might observe on a random visit to the Joinery Department:

‘One or two long staircases partly assembled, and crossing several work areas; large door frames on trestles being assembled; stacks of window components for a large contract being prepared and jointed, and so on. Offcuts and wood shavings are scattered around the work area, but are periodically cleared when they get in the way or form a hazard. The joiners try to fit in with each other over the use of machinery, so are often working on several, part-finished items at once. Varnishing or staining has to be done when it’s quiet, for example towards the end of the working day or at weekends, or even outside, to avoid sawdust contamination. Long offcuts are stacked around the workshop, to be used up on any future occasion when these lengths or sections are required. However, it is often easier to take a new length of timber for each job, so the offcuts do tend to build up over time. Unfortunately, everything I have described is getting worse as we get busier … our sales are increasing so the system is getting more congested. The joiners are almost climbing over each other to complete their work. Unfortunately, despite having more orders, the department has remained stubbornly unprofitable!

’Whilst analysing in detail the lack of profit, we were horrified to find that, for the majority of orders, the actual times booked by the joiners exceeded the estimated times by up to 50 per cent. Sometimes this was clearly attributable to the inexperience of newly employed joiners. Although fully trained and qualified, they might lack the experience needed to complete a complex job in the time an Estimator would expect; but there had been no feedback of this to the individual. We then put one of these men on doors only; having overcome his initial reluctance, he has become an enthusiastic “door expert” and gets closely involved in quotations too, so now he always does his work within the time estimates! However, the main time losses were found to be the result of general delays caused by congestion, interference, double-handling, and rework to rectify in-process damage. Moreover, we found that a joiner walked an average of nearly 5 km a day, usually carrying around heavy bits of wood.

‘When I did my operations management course on my MBA, the professor described the application of cellular manufacturing and JIT. From what I can remember, the idea seems to be to get better flow, reducing the times and distances in the process, and thus achieving quicker throughput times. That is just what we needed, but these concepts were explained in the context of high-volume, repetitive production of bicycles, whereas all the products we make are one-offs. However, although we do make a lot of different staircases, they all use roughly the same process steps:

1 Cutting timber to width and length

2 Sanding

3 Machining

4 Tenoning

5 Manual assembly (glue and wedges)

‘We have a lot of unused factory floor space, so it would be relatively easy to set up a self-contained staircase cell. There is a huge demand for specially-made stairs in this region, but also a lot of competing small joinery businesses with low overheads, which can beat us on price and lead-time. So we go to a lot of trouble quoting for stairs, but only win about 20 per cent of the business. If we could get the cell idea to work, we should be more competitive on price and delivery, hence winning more orders. At least that is the theory. I know we will need a lot more volume to justify establishing the cell, so it’s really a case of whether to construct a cell in anticipation of higher demand, or to try to win more business first. To do the latter, we would have to reduce our selling prices and lead-times, and then allocate more joiners to complete the higher volumes of orders until we had enough work to set up the cell. I personally favour setting up the cell first so that we can have a “capacity leads demand” strategy.’

Questions

1. To what extent could (or should) Dean expect to apply the philosophies and techniques of JIT to the running of the staircase cell? (2.5 MM)

2. What are likely to be the main categories of costs and benefits in establishing the cell? Are there any non-financial benefits which should be taken into account? (2.5 MM)

3.How different would the cell work (job design) be to that in the main Joinery Department? (2.5 MM)

4. What risks are associated with Dean’s proposal?

(2.5 MM)

Note:

  • You must include at least 5 references.
  • Format your references using APA style.
  • Each answer must not be less than 300 words

Answers

  • Answer-
  • Answer-
  • Answer-
  • Answer-

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Description

Description CAREFULLY • The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. • Assignments submitted through email will not be accepted. • Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on

Description

Description Accounting Coop training report3000words include points below : 1. Process supplier payments to ensure accurate and timely payment 2. Review incoming invoices for proper coding and approvals 3. Record, review, and post journal entries to the general ledger 4.Manging and ensuring compliance with all zakat & VAT polices &

Description

Description Release date: 06-April-2025__________________Due date: 03-May-2025 Instructions for submission: Assignment must be submitted with properly filled cover sheet (Name, ID, CRN, Submission date) in word document, Pdf is not accepted. Length of the write-up should be 1 to 2 pages (500 -750 words). Text size 12-Times New Roman with double

Description

Description Release date: 06-April-2025__________________Due date: 03-May-2025 Instructions for submission: Assignment must be submitted with properly filled cover sheet (Name, ID, CRN, Submission date) in word document, Pdf is not accepted. Length of the write-up should be 1 to 2 pages (500 -750 words). Text size 12-Times New Roman with double

Description

Description Release date: 06-April-2025__________________Due date: 03-May-2025 Instructions for submission: Assignment must be submitted with properly filled cover sheet (Name, ID, CRN, Submission date) in word document, Pdf is not accepted. Length of the write-up should be 1 to 2 pages (500 -750 words). Text size 12-Times New Roman with double

Description

Description Guidelines: Cover sheet should be attached with assignment Use the excel sheet for your calculations to answer the assignment questions Complete student’s information on the first page of the document. Font should be 12 Times New Roman Line spacing should be 1.5 The text color should be “Black” Maximum

Description

Description Guidelines: Cover sheet should be attached with assignment Use the excel sheet for your calculations to answer the assignment questions Complete student’s information on the first page of the document. Font should be 12 Times New Roman Line spacing should be 1.5 The text color should be “Black” Maximum

Description

Description Guidelines: Cover sheet should be attached with assignment Use the excel sheet for your calculations to answer the assignment questions Complete student’s information on the first page of the document. Font should be 12 Times New Roman Line spacing should be 1.5 The text color should be “Black” Maximum

Description

Description Submission Guidelines: Write 1-2-page(s) essay not less than 200 words and maximum of 300 words excluding references with a font of Times New Roman and size of 12. The line spacing should be 1.5. Heading should be Bold and text color should be Black Avoid Plagiarism Assignments must be

Description

Description See College of Health Sciences Department of Health Informatics HCI-316 – Group Presentation In this group project, teams of 3–5 students will collaborate to explore and present exciting developments in digital health innovation within the Middle East, with a particular focus on Saudi Arabia (KSA). The goal is to

Description

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment-3 MGT425-Spreadsheet Decision Modeling Due Date: 26/04/2025 @ 23:59 (End of Week 12) Course Name: Spreadsheet Decision Modeling Course Code: MGT425 Student’s Name: Semester: Second

Description

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 3 Organization Design and Development (MGT 404) Due Date: 26/04/2025 @ 23:59 Course Name: Organization Design and Development Course Code: MGT404 Student’s Name: Semester:

Description

Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 3 Business Ethics and Organization Social Responsibility (MGT 422) Due Date: 26/04/2025 @ 23:59 Course Name: Business Ethics and Organization Social Responsibility Course Code:

Description

Description CT Digital Health Technologies in KSA (110 points) Evaluate the use of digital health technologies in Saudi Arabia that would support expanding patient access to medical care by researching a minimum of four peer-reviewed articles on this topic and then creating a brochure or infographic using appropriate templates available

Description

Description IMC campaign plan An IMC campaign plan involves the integration of different marketing communication tools such as advertising, public relations, direct marketing, sales promotion, and digital marketing to achieve marketing objectives. For this critical thinking assignment select one of the following scenarios to create an integrated marketing communications plan

Description

Description I want the answer without similarity at all, and Conceptual and professional, they’re important. I have a solution model ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment-3 MGT324-Public Management Due Date: 26/04/2025

Description

Description Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. Avoid plagiarism, the work should be in your own words, copying from students or other resources without proper referencing will result in ZERO marks. No exceptions. All answered must be typed

Description

Description I want the answer without similarity at all, and Conceptual and professional, they’re important. I have a solution model ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 3 Quality Management (MGT 424)